A client required the design and build of a nitrogen generator system and engaged CW to manage the complete electrical and automation scope, including coordination of mechanical installation.
The nitrogen generator required a fully integrated electrical and automation system capable of reliable operation across multiple sites throughout Australia and the Pacific region.
The client required a partner to manage the project end-to-end — from control system design through to implementation — ensuring the system was robust, transportable, and ready for long-term operation in varying environments.
The client required:
CW managed the project from concept to commissioning, delivering:
The system was engineered for reliability, serviceability, and consistent performance across varied operating environments.
The nitrogen generator was successfully commissioned and has been operating reliably on site for over two years.
The transportable design allows the system to be deployed across Australia and the Pacific region as required, providing operational flexibility and long-term value.
The client remains highly satisfied with system performance and delivery outcomes.